PROJECT: Evaporator Sectioning - LSE

Client: LH Plc

Location: London Stock Exchange

Project Length: 1 week

Project Overview

BD Nuclear received an enquiry from a contractor working at the London Stock Exchange to assist with the removal of large evaporator machinery so that the aging equipment could be replaced.  The previous method of size reduction being used was hot cutting but due to fumes and intrinsic hazards associated with this method we were tasked to provide a provide an alternative solution. Housed within a confined space environment, the evaporators needed to be cut into sections to facilitate their removal due to them being built in situ.  BD Nuclear provided a cold cutting solution to section the evaporator and completed the task ahead of schedule.

<< VIEW ALL PROJECT PHOTOS >>